홈페이지> 블로그> What are the points of attention in geogrid construction?

What are the points of attention in geogrid construction?

October 05, 2021

The grid is a two-dimensional grid or a certain three-dimensional three-dimensional grid screen made of high-molecular polymer such as polypropylene, polyvinyl chloride, etc., which is formed by thermoforming or molding. When used as a civil engineering project, it is called geotechnical engineering. Grille.


Construction site: Compaction, leveling, and removal of spiked projections are required.
Grid laying: In the leveling and compaction field, the main force direction (vertical) of the installed paving grid should be perpendicular to the direction of the embankment axis, and the paving should be smooth, non-folding and as tight as possible. With nails and earth and stone pressure fixed, the laying of the grid is the main direction of force is the best length of the joints, the connection between the web and the width of the bandage can be manually tied, lap width of not less than 10cm. If the grid is set more than two layers, the layers should be staggered between the layers. After large areas are laid, the overall straightness should be adjusted. After filling a layer of soil, before the rolling, the grid should be tensioned again by hand or machine, and the force should be uniform, so that the grid is in a straight and stress state in the soil.
Filler selection: Fillers should be selected according to design requirements. It has been proved that fillers can be used in addition to frozen soil, swamp soil, household garbage, chalk soil and diatomaceous earth. However, the mechanical properties of the gravel soil and the sand soil are stable and are affected by the water content. The particle size of the filler must not exceed 15 cm, and attention should be paid to controlling the gradation of the filler to ensure compaction weight.
Padding and compaction of the filler: When the grid is laid and positioned, it should be timely filled and covered. The exposed time must not exceed 48 hours. It can also adopt the flowing operation method of backfilling. Paving at the two ends first, fixing the grille and pushing it towards the middle. The order of rolling is first on both sides and then on the middle. When compacting, the pressure roller cannot directly contact with the sliver material, and the non-compacted screed generally does not allow the vehicle to travel on it so as to avoid dislocation of the sturdy material. Layered compaction is 20-30cm. The degree of compaction must meet the design requirements, which is the key to the success or failure of reinforced earth engineering.

Anti-drainage measures: In the reinforced earth works, we must do a good job of drainage treatment inside and outside the wall; we must do a good foot protection, prevent erosion; in the soil should be set filter, drainage measures, if necessary, should be set geotextile, permeable Tube (or blind ditch). Drainage should be done in a dredging manner, and it cannot be blocked, otherwise it may cause hidden troubles.


We also produce kinds of biaxial geogrid,such as fiberglass geogrid,polyester geogrid,pp biaxial geogrid,etc.

문의하기

Author:

Mr. Allen

이메일:

chgeogrid@163.com

Phone/WhatsApp:

+8613854820689

인기 상품
You may also like
Related Categories

이 업체에게 이메일로 보내기

제목:
이메일:
메시지:

Your message must be betwwen 20-8000 characters

Copyright © 2024 Feicheng Lianyi Engineering Plastics Co., Ltd판권소유

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

송신