Geogrid construction process: inspection and cleaning of the lower bearing layer → artificial laying of geogrid → lap joint, lashing, fixing → paving the upper roadbed soil → rolling → detection. The geogrid is laid on the flat lower bearing layer according to the width required by the design. The upper and lower layers of the packing do not smash the debris of the geogrid. When the geogrid is laid, the direction of high strength is arranged perpendicular to the axis direction of the embankment. The geogrid is laid horizontally. Tightening and pulling when laying, avoiding wrinkles, twists or potholes. The geogrid is spliced along the longitudinal direction by a lap joint method, and the lap width is not less than 30 cm. After the geogrid is laid, the upper layer of filler is artificially laid, and the rolling is completed in time to avoid long-term exposure. Then use mechanical transportation, leveling, and rolling. The mechanical paving and rolling are pushed from the two sides to the middle, and the rolling is carried out from the two sides to the middle, and the compaction degree is maintained to meet the specification requirements.


We also produce kinds of biaxial geogrid,such as fiberglass geogrid,polyester geogrid,pp biaxial geogrid,etc.

문의하기

Author:

Mr. Allen

이메일:

chgeogrid@163.com

Phone/WhatsApp:

+8613854820689

인기 상품
You may also like
Related Categories

이 업체에게 이메일로 보내기

제목:
이메일:
메시지:

Your message must be betwwen 20-8000 characters

Copyright © 2024 Feicheng Lianyi Engineering Plastics Co., Ltd판권소유

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

송신